Blog

  • Send Initial Repair Estimate

    n

    I hope this message finds you well. As part of the next steps in your claim process, please see the attached Initial Repair Estimate for your reference.

    nnnn

    To continue moving forward:

    nnnn
      n
    1. If the Initial Repair Estimate includes missed or additional damages, you or your repair professional may provide supporting documents for review. These can be sent to myclaiminfo@assurant.com.
    2. nnnn
    3. In the event the Initial Repair Estimate involves Recoverable Depreciation, please submit a Certificate of Completion (COC) along with supporting materials (e.g., photos of completed repairs or a paid invoice from your repair professional) to myclaiminfo@assurant.com.
    4. n
    nnnn

    Additionally, please ensure that mitigation invoices are forwarded for review by the third party, which will determine recommended costs and issue payments accordingly.

    nnnn

    If you have any questions or require further assistance, don’t hesitate to reach out. I look forward to working with you throughout this process.

    n
  • No Photos of Missed or Additional Damages

    n

    After reviewing the repair estimate submitted, it appears to contain duplicate line items compared to the initial repair estimate. Additionally, it does not include any photos of missed or additional damages.

    nnnn

    We kindly request that you edit the repair estimate accordingly and, if necessary, resubmit a supplemental estimate addressing any missed or additional damages.

    nnnn

    Thank you for your attention to this matter. Please don’t hesitate to reach out if further clarification is needed.

    n
  • 00104805213

    n

    Inbound Call

    nnnn

    Summary of Inbound Call
    PIB stated he did Not receive the Repair Estimate, PIB stated he did receive the Repair Check, ISA mailed and emailed Repair Estimate, ISA confirmed w/Admin.

    n
  • 00201895500

    n

    Loss Date

    nnnn

    01-15-2025

    nnnn

    Cause of Loss

    nnnn

    Water Damage

    nnnn

    Deductible

    nnnn

    $2,500.00

    nnnn

    Loss Description

    nnnn

    WATER DAMAGE: Basement is flooded and mold started to build up. insured is not sure where the water is coming from and need to file a claim for repairs, mold remediation and inspection.

    nnnn

    Notice Of Loss Comments

    nnnn

    Reported by: JENNIFER MONTALVO-INSR~ – BTTC: Anytime / 6312064493 / jgheuvel66@gmail.com

    nnnn

    Claim Status

    nnnn

    New Claim – Interior damage Stated in the Loss Description

    nnnn

    Video Inspection or PLNAR Applicable?

    nnnn

    No unknown COL

    nnnn

    Is an IA or Expert needed to inspect or determine the cause or origin of damage:

    nnnn

    Yes

    nnnn

    IA Details

    nnnn

    Claim assignment sent to ALD for loss inspection

    nnnn

    Is There Subrogation Potential Known at This Time?

    nnnn

    There is no known subrogation at this time. Pending inspection findings and further investigation.

    nnnn

    Subrogation Referral Sent:

    nnnn

    No

    nnnn

    Is a Reservation of Rights letter needed?

    nnnn

    No

    nnnn

    ISA Contact Letter Sent

    nnnn

    Yes

    nnnn

    ISO: No previous related claims located via iCE / ISO searches

    nnnn

    ICE: No further research required as loss was confirmed to have occurred within the reported coverage period.

    nnnn

    TrackAll Start Date 11/1/2023 TrackAll End Date 11/1/2024

    nnnn

    Is the Roof (RFG) or Exterior Damaged (DMG) Stated?

    nnnn

    No – Exterior damage was not stated in the Loss Description

    nnnn

    Is Interior Stated Damaged (DMG) Stated?

    nnnn

    Interior damage was stated in the Loss Description – Yes

    nnnn

    Number of rooms involved loss?

    nnnn

    Number of rooms involved loss: 1 (0 min / 25 max) room(s)

    nnnn

    Is mitigation in progress or has any mitigation work been completed?

    nnnn

    No – Mitigation is in progress was Not Stated in the Loss Description

    nnnn

    Was insured advised of responsibility to mitigate loss?

    nnnn

    Yes – ISA Emailed and Mailed the ISA Contact Letter w/Policy

    nnnn

    Contact Number:

    nnnn

    (631) 206-4493

    nnnn

    Contact Name:

    nnnn

    JENNIFER MONTALVO

    nnnn

    Who was contacted:

    nnnn

    Who was contacted?: Primary Insured Borrower (PIB)

    nnnn

    Contact Method:

    nnnn

    ISA Emailed and Mailed the ISA Contact Letter: Yes

    nnnn

    Has the cause of loss been identified:

    nnnn

    No

    nnnn

    Will the reserves need to be raised

    nnnn

    Will the reserves need to be raised?: Not at this time

    nnnn

    Action Plan / Additional Comments / Notes:

    nnnn

    ISA reviewed claim file and sent an assignment to ALD for loss inspection

    nnnn

    ISA will follow up on

    nnnn

    04/11/2025

    n
  • 00104846828

    n

    Initial Status Update

    nnnn

    Pending Information:
    – Insured: N/A

    nnnn

    – From Carrier: Adjusters Report

    nnnn

    Status Update Summary

    nnnn

    Emails Checked: Yes – I Checked Emails No New Mail

    nnnn

    Xact Checked: Yes – I Checked Xact No Est, Notes, Activates

    nnnn

    Pending:

    nnnn

    Initial Contact
    Loss Inspection
    Repair Estimate Approved
    Closing Report Approved
    Settlement Contact
    Explanation of Benefits
    Close Claim
    10 Day Status

    nnnn

    Follow-Up Date: 04/11/2025

    nnnn

    n
  • 00104846828

    n

    Initial Claim Review

    nnnn

    New Claim – Exterior damage Stated in the Loss Description

    nnnn

    Prior Claim Search:
    ISO – No previous related claims located via iCE / ISO searches

    nnnn

    ICE – No further research required as loss was confirmed to have occurred within the reported coverage period.

    nnnn

    TrackAll – 6/1/2019 to 6/1/2024

    nnnn

    Who was contacted?: Primary Insured Borrower (PIB) ISA Emailed and Mailed the ISA Contact Letter: Yes

    nnnn

    (318) 434-0338

    nnnn

    Confirmed Named Insured in ICE: No

    nnnn

    Confirmed Email Address in ICE: No

    nnnn

    Confirmed Property Risk Address in ICE: No

    nnnn

    Loss Description: Windstorm – NI called in to file a claim since his window broke due to strong wind.

    nnnn

    What Damages are being claimed: Pends Initial V2V Contact

    nnnn

    How old is the roof, siding, or affected materials: Pends caption report

    nnnn

    How old is the home: Unknown at this time

    nnnn

    How old is the flooring, or affected materials: Unknown at this time

    nnnn

    Has there been any recent work or remodeling to the home: Unknown at this time

    nnnn

    No – Mitigation is in progress was Not Stated in the Loss Description

    nnnn

    Yes – ISA Emailed and Mailed the ISA Contact Letter w/Policy

    nnnn

    No – Temporary repairs has Not been completed was Stated in the Loss Description

    nnnn

    No Exterior damage stated in the Loss Description

    nnnn

    There is no known subrogation at this time. Pending inspection findings and further investigation.

    nnnn

    Confirmed Mortgagee: Pends V2V Contact

    nnnn

    Yes Reassigned to 7625

    nnnn

    Reviewed with insured Coverages, including Policy Limits, 2,000.00 Deductible(s), the Claim Process, and typical Time Frames. Instructed the Insured to Mitigate the Damages and To Keep Track of Expenses. Set expectations for the next steps. Provided My Contact Information & Office Hours.

    nnnn

    n
  • Initial Contact Letter – IA Inspection

    n

    My name is Ed Freeney, and I will be your Adjuster for this claim. My primary goal is to ensure that you receive everything your policy entitles you to throughout this process. To facilitate the best possible outcome, I ask that you take proactive steps to prevent further damage and keep me informed of any new developments regarding the claim.

    nnnn

    Coverages, including Policy Limits and a Deductible of an amount, will be factored into the Initial Repair Estimate. The typical time frame for claim settlement and closure is approximately five business days following the loss inspection.

    nnnn

    The Insured has been instructed to mitigate damages and maintain thorough records of all related expenses. The next step in the process involves a third-party scheduling and conducting the loss inspection.

    nnnn

    The Claim Process Steps

    nnnn

    1. The Loss Inspection Date. To achieve an Agreed Scope, it’s recommended to have your repair professional present during the inspection.

    nnnn

    2. The Cause of Loss will be identified, and an Initial Repair Estimate will be created.

    nnnn

    3. Based on your policy, an actual cash value payment (less the deductible) will then be issued, along with the Initial Repair Estimate.

    nnnn

    4. If the Initial Repair Estimate includes Missed or Additional Damages, you or your repair professional can provide supporting documents for review by emailing them to myclaiminfo@assurant.com.

    nnnn

    5. Additionally, if the Initial Repair Estimate involves Recoverable Depreciation, you’ll need to submit a Certificate of Completion (COC) to myclaiminfo@assurant.com. This can include photos of the completed repairs or a paid invoice from your repair professional after the repairs are finished.

    nnnn

    *A third party will review all mitigation invoices, and payments will be issued based on the recommended cost.

    nnnn

    If you have any questions or concerns, please feel free to reach out. I look forward to assisting you.

    nnnn

    n
  • 00201894586

    n

    Initial Status Update

    nnnn

    Pending Information:
    – Insured:

    nnnn

    – From Carrier:

    nnnn

    Status Update Summary

    nnnn

    Emails Checked: Yes – I Checked Emails No New Mail

    nnnn

    Xact Checked: Yes – I Checked Xact No Est, Notes, Activates

    nnnn

    Pending:

    nnnn

    Initial Contact
    Loss Inspection
    Repair Estimate Approved
    Closing Report Approved
    Settlement Contact
    Explanation of Benefits
    Close Claim
    10 Day Status

    nnnn

    Follow-Up Date: 04/10/2025

    n
  • 00201894586

    n

    Initial Claim Review

    nnnn

    New Claim – Exterior and Interior damage Stated in the Loss Description

    nnnn

    Prior Claim Search:
    *ISO – Previous claims located as outlined below

    nnnn

    Claim Number: 00201455140 Date of Loss: 01/06/2022 – RFG DMG

    nnnn

    *ICE – FLR147340002 10-19-2018 10-19-2019 to FLR147340007 10-19-2023 10-19-2024

    nnnn

    *TrackAll – 10/19/18 to 10/19/2024

    nnnn

    Has the prior claim been discussed with the insured: See Initial Contact Note

    nnnn

    Who was contacted: Who was contacted?: See Initial Contact Note

    nnnn

    Contact Number: See Initial Contact Note

    nnnn

    Confirmed Named Insured in ICE: See Initial Contact Note

    nnnn

    Confirmed Email Address in ICE: See Initial Contact Note

    nnnn

    Confirmed Property Risk Address in ICE: See Initial Contact Note

    nnnn

    Statement of Damages: See Initial Contact Note

    nnnn

    What Damages are being claimed: See Initial Contact Note

    nnnn

    Loss Description: FLOOD – its raining the house flooded inside the house.

    nnnn

    How old is the roof, siding, or affected materials: See Initial Contact Note

    nnnn

    How old is the home: See Initial Contact Note

    nnnn

    How old is the flooring, or affected materials: See Initial Contact Note?

    nnnn

    Has there been any recent work or remodeling to the home: See Initial Contact Note

    nnnn

    No – Mitigation is in progress was Not Stated in the Loss Description

    nnnn

    Discussed mitigation applicable limits and or endorsements: See Initial Contact Note

    nnnn

    Yes – ISA Emailed and Mailed the ISA Contact Letter w/Policy

    nnnn

    No – Temporary repairs has Not been completed was Stated in the Loss Description

    nnnn

    No Exterior damage stated in Loss Description

    nnnn

    There is no known subrogation at this time. Pending inspection findings and further investigation.

    nnnn

    Confirmed Mortgagee: See Initial Contact Note

    nnnn

    FLR147340002 10-19-2018 10-19-2019 to FLR147340007 10-19-2023 10-19-2024

    nnnn

    Yes IA 7304 was Assigned

    nnnn

    Emailed insured Coverages, including Policy Limits, Deductible(s), the Claim Process, and typical Time Frames. Instructed the Insured to Mitigate the Damages and To Keep Track of Expenses. Set expectations for the next steps. Provided My Contact Information & Office Hours.

    nnnn

    n
  • 00104802747

    n

    Status Update

    nnnn

    nnnn

    Status Update Summary

    nnnn

    ISA Reviewed Claim File w/Admin, ISA Sent Closing Report

    nnnn

    Emails Checked: Yes – I Checked Emails No New Mail

    nnnn

    Xact Checked: Yes – I Checked Xact No Est, Notes, Activates

    nnnn

    Pending:

    nnnn

    Closing Report Approved
    Settlement Contact
    Explanation of Benefits
    Close Claim

    nnnn

    Follow-Up Date: 04/09/2025

    n